Construction Closure Overview
June 2024 – February 2027
- Richmond Street southbound lane closure
- Richmond Street southbound sidewalk closure
- Northbound sidewalk remains open
- Elbow Street northbound sidewalk closure
- Chestnut Street parking spots to be taken offline
- Elm Street parking spots to be taken offline
September 2 - January 17, 2026
- Elbow Street closed for bridge detailing

Construction Updates
Please note, scope may change based on existing conditions found in the field.
December 2025
Week of December 8, 2025
- Install roofing level 9
- Ductwork and MEP mains level 8
- Install epoxy pads level 8
- Curtainwall install 6 and 7
- Curtainwall starter sill level 1
- Ductwork install level 6
- Exterior masonry on level 1
- Framing level 5 north
- Level 5 overhead MEP rough
- Install tarps on level 8
- MEP rough on level 1
- Install passenger elevators
- In-wall rough level 2
- Frame and sheath stair 3
Week of December 15, 2025
- Install roofing level 9
- Ductwork and MEP mains level 8
- Install epoxy pads level 8
- Curtainwall install 1 and 7
- Curtainwall starter sill L
- MEP rough level 5
- Ductwork install level 6
- Exterior masonry on level 1
- Framing level 5 north
- Level 5 overhead MEP rough
- Install tarps on level 8
- MEP rough on level 1
- Pour pads on level 1
- Install passenger elevators
- Frame and sheath stair 1
Week of December 22, 2025
- Site closed Thursday, December 25 for Christmas
- Ductwork and MEP mains level 8
- Curtainwall install 1, 8 and 7
- MEP rough level 5
- Ductwork install level 6
- Exterior masonry on level 1
- Framing level 5 north
- Level 5 overhead MEP rough
- Install tarps on level 8 and 9
- MEP rough on level 1
- Pour pads on level 1
- Install passenger elevators
- Install drywall level